AIKON Canned Pump Support | Selection, FAQ and Technical Guidance
Input checklist panel

Application + duty
Open Contact FormApplication, flow, and head decide the route and duty window
If these are missing, support cannot judge whether the request belongs in liquid cooling, HVAC, large flange, or a more standard family first.

Medium + electrical
Open Technical DocsMedium, temperature, voltage, and control change the recommendation
If these stay vague, the first answer usually falls back to generic model talk instead of a usable technical route.

Connection + installation
Ask Technical SupportConnection, flange logic, and site limits decide fit and document need
If these are unclear, support cannot tell whether the next useful step is quote, technical docs, or more route judgement.
When to stay in support, and when to move to quote

Stay in support
Stay here when the route is roughly clear but application, duty, medium, or connection details still need judgement.
Move to quote
Move to contact once the route is clear and the core inputs are complete enough for quotation or a structured first reply.
Move to technical docs
Move to technical docs when the real blocker is file type, dimension confirmation, installation reference, or maintenance information.
Selection and technical handoff FAQ
Use the FAQ after the input checklist, not before it. The goal is to answer technical input and route questions without turning the page into a generic FAQ square.
Start with application, flow, head, medium, voltage, connection size, and installation conditions.
Add temperature, duty cycle, control requirements, or corrosion conditions when they are already known so support can shorten the first useful reply.

If the route is clear but the blocker is really a document or drawing question, move into technical docs instead of forcing support to behave like a file center.
Technical Docs